Thank you for considering John Morlan Chrysler! We are a family owned dealership and take pride in taking excellent care of our customers and offering world class customer service. This vehicle is a BMW M3 CS, a 2024 model with low mileage of 6108 miles. It is an all wheel drive with a 3.0 liter 6 cylinder engine and twin turbo, providing excellent fuel economy of 15 mpg in the city and 22 mpg on the highway. The vehicle also features blind spot sensor, hill start assist, full time four wheel drive, and interior with leather accents. It also has navigation system with voice recognition, and a touch screen display for added convenience. This car is truly one of a kind and will surely turn heads on the road. We appreciate the opportunity to serve you and look forward to hearing from you today.
|
|

- Head-Up Display
- Suspension, Active
- Navigation System With Voice Recognition
- Navigation System, Touch Screen Display
- Headlights, LED
- Driver Attention Alert System
- Interior, Carbon Fiber Trim
- Pre-Collision Warning System, Audible Warning
- Pre-collision Warning System, Vibrating Steering Wheel
- Pre-Collision Warning System, Visual Warning
- Blind Spot Sensor
- Cross Traffic Alert, Rear
- Airbags - Front - Knee
- Lane Deviation Sensors
- Driver Seat, Power Adjustments: 10
- Air Conditioning - Front - Automatic Climate Control
- Memorized Settings, Includes Driver Seat
- Memorized Settings, Includes Exterior Mirrors
- Traffic Sign Recognition
- Air Conditioning - Front - Dual Zones
- Steering Wheel Mounted Controls, Paddle Shifter
- Interior, Leather Accents
- Mirror Color, Carbon Fiber
- Windows, Front Wipers: Rain Sensing
- Windows, Front Wipers: Speed Sensitive
- Engine, Push-Button Start
- Engine, Auto Stop/Start
- Driver Seat, Heated
- Headlights, Automatic High Beam Dimmer
- Remote Engine Start
- Passenger Seat, Heated
- Universal Garage Door Opener, Homelink
- Daytime Running Lights, LED
- Inside Rearview Mirror, Auto-Dimming
- Exterior Mirrors, Power Folding
- Seats, Front Seat Type: Sport Bucket
- Tail And Brake Lights, LED
- Airbags - Front - Side
- Airbags - Front - Side Curtain
- Airbags - Rear - Side Curtain
- Passenger Seat, Power Adjustments: 10
- Driver Adjustable Suspension: Ride Control
- Interior, Aluminum Accents
- Parking Sensors, Front
- Parking Sensors, Rear
- Air Conditioning, Air Filtration: Active Charcoal
- Drivetrain, Locking Differential: Rear
- Memorized Settings, Includes Audio System
- Memorized Settings, Includes Climate Control
- Cruise Control
- Electronic Messaging Assistance With Voice Recognition
- Power Steering, Speed-Proportional
- ABS Brakes (4-Wheel)
- Exterior Mirrors, Driver Side Auto-Dimming
- Power Windows: With Safety Reverse
- Audio Auxiliary Input: IPod/IPhone Integration
- Audio Auxiliary Input: USB
- Sport Suspension
- Ambient Lighting, Color-Adjustable
- Auto-Lock
- Cornering Brake Control
- Emergency Braking Preparation
- Power Door Locks, Anti-Lockout Feature
- Exterior Mirrors, Power
- Exterior Mirrors, Heated
- Drivetrain, 4WD Type: Full Time
- Rear Seats, 40-20-40 Split Bench
- Electronic Parking Brake, Auto Off
- Exterior Entry Lights, Puddle Lamps
- Exterior Entry Lights, Security Approach Lamps
- Floor Mat Material, Carpet
- Memorized Settings, Number Of Drivers: 2
- Rear Spoiler, Lip
- Security, Anti-Theft Alarm System
- Taillights, Adaptive
- Windows, Front Wipers: Variable Intermittent
- Windows, Rear Defogger
- Braking Assist
- Drivetrain, Drive Mode Selector
- Braking assist, hill start assist
- Airbags - Front - Dual
- Exterior Mirrors, Integrated Turn Signals
- Power Brakes
- Rear Seats, Split Folding
- Security, Engine Immobilizer
- Exterior Mirrors, Reverse Gear Tilt
- Front 12V Power Outlet(s)
- Steering Wheel, Tilt And Telescopic
- Child Seat Anchors, LATCH System
- Front Suspension Classification: Independent
- Front Suspension Type: Strut
- Headlights, Auto On/Off
- Multi-Function Display
- Center Console, Front Console With Armrest And Storage
- Electronic Brakeforce Distribution
- Compass
- Headlights, Auto Delay Off
- External Temperature Display
- Fuel Economy Display, MPG
- Fuel Economy Display, Range
- One-Touch Windows: 4
- Stability Control
- Touch-Sensitive Controls
- Traction Control
- Airbags - Passenger - Occupant Sensing Deactivation
- Door Courtesy Lights
- Driver Seat, Power Adjustments: Recline
- Passenger Seat, Power Adjustments: Recline
- Power Windows: Remote Operation
- Reading Lights, Front
- Reading Lights, Rear
- Seatbelts, Emergency Locking Retractors: Front
- Seatbelts, Seatbelt Force Limiters: Front
- Seatbelts, Seatbelt Pretensioners: Front
- Seats - Driver Seat Power Adjustments: Height
- Seats - Passenger Seat Power Adjustments: Height
- Tachometer
- Vanity Mirrors, Dual Illuminating
- Warnings And Reminders, Maintenance Reminder
- Cargo Area Light
- Suspension, Stabilizer Bar(s): Front
- Suspension, Stabilizer Bar(s): Rear
- Rear Bumper Color, Body-Color
- Steering Wheel Mounted Controls, Audio
- Steering Wheel Mounted Controls, Cruise Controls
- Steering Wheel Mounted Controls, Multi-Function Screen Controls
- Steering Wheel Mounted Controls, Phone
- Steering Wheel Mounted Controls, Voice Recognition Controls
- Impact Sensor, Alert System
- Impact Sensor, Battery Disconnect
- Impact Sensor, Door Unlock
- Impact Sensor, Fuel Cut-Off
- Impact Sensor, Post-Collision Safety System
- Seatbelts, Emergency Locking Retractors: Front And Rear
- Seatbelts, Seatbelt Warning Sensor: Driver And Passenger
- Adjustable Rear Headrests
- Adjustable Rear Headrests, Foldable
- Audio - Antenna: Diversity
- Audio - Antenna: Mast
- Automatic Hazard Warning Lights,
- Child Safety Locks
- Clock
- Crumple Zones, Front
- Digital Odometer
- Emergency Interior Trunk Release
- Front Headrests, Integrated
- Front Seatbelts: 3-Point
- Headlights, Tinted
- Number Of Front Headrests, 2
- Number Of Rear Headrests, 3
- Seatbelts, Second Row 3-Point
- Trip Odometer
- Warnings And Reminders, Low Fuel Level
- Windows, Lockout Button
*While every reasonable effort is made to ensure the accuracy of this data,
we are not responsible for any errors or omissions contained on this page.
Please verify all information with a dealership sales representative.
|
|
Pricing and Information Disclaimer: All vehicle prices are subject to change without notice. This may be due to, but not limited to, accessories or options added by our accessory specialists. The Payment Calculator is for informational purposes only. The actual payment can vary greatly due to credit history, downpayment, trade-in value, payoff of trade-in, actual rate and term due to age of the vehicle. Not all vehicles will qualify for extended term financing and special interest rates. See dealer for actual payment terms and conditions.
|
|
|