|
Red Tag Sale Price:
$73,677
|
- Body style: Sedan
- Mileage: 25,829
-
Engine: 6 Cylinder
3L
- Trans: 8-Speed Shiftable Automatic
- Exterior Color: Black Sapphire Metallic
- Interior Color: Black
- Stock: MFL03350
- VIN: WBS33AY03MFL03350
|

Recent Arrival! Odometer is 10806 miles below market average! *Executive Package*Heated Steering Wheel*Heated Seats*Our exhilarating No Accidents Reported, Miles Below Market Average 2021 BMW M Series M3 Competition Sedan, featuring the Executive Package in bold Black Sapphire Metallic, embodies the spirit of a renegade performance machine, combining aggressive twin-turbo power, track-tuned precision, and race-inspired styling to deliver a commanding and unforgettable driving experience. Motivated by a TurboCharged 3.0 Liter M TwinPower 6 Cylinder producing 473hp to an 8 Speed Automatic transmission that can move you to 60mph in only 4.2 seconds. This Rear Wheel Drive sedan is ready to attack the track with M racing-inspired suspension, braking, and steering systems, and it scores nearly 26mpg on the highway. Muscular good looks are standard for our M3, with LED lighting, forged alloy wheels, aero body extensions, and quad tailpipes.Our M3 Competition cabin features the Executive Package, which includes heated, leather power front sport seats, a heated leather-wrapped steering wheel, a head-up display, remote start, wireless charging, automatic climate control, ambient lighting, carbon-fiber trim, and an ergonomic layout designed for enhanced performance and faster lap times. Intelligent technology is also on board, featuring an iDrive infotainment system, full-color navigation, a touch controller, Bluetooth, and a Harman Kardon sound system. Its an interior designed to satisfy the racer inside you!BMW bolsters your confidence behind the wheel with a rearview camera, dynamic stability control, tire-pressure monitoring, cornering brake control, hill-start assist, and much more. Dare to own our M3 Competition sedan and start driving with a bold attitude backed by a heritage of high performance! Save this Page and Call for Availability. We Know You Will Enjoy Your Classic Chevrolet Test Drive Towards Ownership! If youre looking for a huge selection of cars, trucks, and SUVs but also want great customer service, you cant do any better than Classic. Not only are we the largest Chevy dealer in America, but we also strive to be your hometown dealer. Classic Chevrolet has a longstanding reputation for being the type of store that does business the old-fashioned way. We place high value on honesty and integrity. We will treat you with the respect that you deserve. No pressure, no games, no gimmicks & no tricks. Just a great vehicle at a fair price in a relaxed atmo
Classic Chevrolet sets the bar for customer relationship. Come and see for yourself what makes us different than any other dealership. We truly care about you. Classic Chevrolet, Relax, Enjoy the Difference. Sales: 817-410-6160
|
|
Click thumbnails below to view larger images
|
|
|
Similar Vehicles
|
2018
Chevrolet
Malibu
LT
Price:
Red Tag Sale Price:
$19,250
Miles: 60,664
Exterior Color: Summit White
Stock Number: JF168149
Engine: 4 Cylinder
Transmission: Shiftable Automatic
|
|
2020
Audi
S8
4.0T quattro
Price:
Red Tag Sale Price:
$41,927
Miles: 62,095
Exterior Color: Gray Metallic
Stock Number: LN013879
Engine: 8 Cylinder
Transmission: 8-Speed Shiftable Automatic
|
|
2024
Toyota
Crown
XLE
Price:
Red Tag Sale Price:
$30,787
Miles: 45,628
Exterior Color: Magnetic Gray Metallic
Stock Number: R3020240
Engine: 4 Cylinder
Transmission: CVT
|
|
2023
Honda
Accord
LX
Price:
Red Tag Sale Price:
$22,927
Miles: 20,082
Exterior Color: Silver
Stock Number: PA058471
Engine: 4 Cylinder
Transmission: CVT
|
|
|
|
Pricing and Information Disclaimer: All vehicle prices are subject to change without notice. This may be due to, but not limited to, accessories or options added by our accessory specialists.
|
|
|