2023 BMW M3 Competition
2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition
« Previous      Next »





Open Google Directions
Price: $80,380
 
  • Body style: Sedan AWD
  • Mileage: 37,187
  • Engine: 6 Cylinder 3L
  • Trans: 8-Speed Shiftable Automatic
  • Exterior Color: Alpine White
  • Interior Color: Fjord Blue/Black
  • Stock: R289391A
  • VIN: WBS43AY03PFN92660

Calculate Monthly Payment
Estimated Monthly Payment:

Purchase Price: 
Down Payment: 
Trade-in Value: 
Trade-in Payoff: 
Interest Rate:  (est A.P.R.)
Loan Term:    (in months)

Payment Calculator Disclaimer
* This calculator is intended solely for general informational purposes and to provide a rough estimate based on the information you have provided. You should not base your decision on this estimate alone. Please note that title, registration, tax and other fees, and personal circumstances such as employment status and personal credit history, were not considered in the calculations. Personal circumstances may have a significant effect on interest rates for which an individual might qualify. Accordingly, we cannot and do not guarantee the accuracy or applicability of the estimates produced by this calculation, and the results from its use should be viewed as hypothetical, for illustrative purposes. At the appropriate time, we recommend that you rely upon actual interest rate and payment information provided to you by your dealer or lender. Does not include tax, title, or doc fee.

Click thumbnails below to view larger images
2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition 2023 BMW M3 Competition

Similar Vehicles
2024 Dodge Durango SRT Hellcat 2024 Dodge Durango SRT Hellcat
Price: Price: $81,019

Miles: 4,358
Exterior Color: White Knuckle Clearcoat
Stock Number: R207599A
Engine: 8 Cylinder
Transmission: 8-Speed Shiftable Automatic

Alpine White 2023 BMW M3 Competition 4D Sedan 3.0L I6 Turbocharged DOHC 24V LEV3-ULEV70 503hp AWD
**GREAT FINANCE OPTIONS AVAILABLE, **TRADES WELCOME, **COME SEE WHY ED MORSE HAS BEEN EXCEEDING CUSTOMERS EXPECTATIONS FOR OVER 70 YEARS.


Cleaned and Sanitized All advertised prices are plus tax, tag, title, registration, and reconditioning costs. Prices do not include predelivery service charge of $999, electronic registration filing fee of $199.7, or tag agency fee of $85. Prices can expire or change at any time without notice. Advertised prices cannot be used in conjunction with other offers, special APR programs, or available dealer cash back, or other incentives. All vehicles subject to prior sale. Prices do not include dealer installed options.
Equipped with Connected Package Pro, M Driver's Package, Parking Assistance Package (Parking Assistant Plus), 16 Speakers, 4-Wheel Disc Brakes, ABS brakes, Adaptive suspension, Air Conditioning, Alloy wheels, AM/FM radio: SiriusXM, Apple CarPlay & Android Auto Compatibility, Auto High-beam Headlights, Auto-dimming door mirrors, Auto-dimming Rear-View mirror, Automatic temperature control, BMW Assist eCall, BMW Curved Display, BMW TeleServices, Brake assist, Bumpers: body-color, Carbon Fiber Trim, Compass, ConnectedDrive Services, Delay-off headlights, Drive Recorder, Driver door bin, Driver vanity mirror, Dual front impact airbags, Dual front side impact airbags, Electronic Stability Control, Emergency communication system: BMW Assist eCall, Enhanced USB & Bluetooth Plus Smartphone Integration, Extended Merino Leather Upholstery, Exterior Parking Camera Rear, Four wheel independent suspension, Front anti-roll bar, Front Bucket Seats, Front Center Armrest, Front dual zone A/C, Front reading lights, Front Ventilated Seats, Fully automatic headlights, Garage door transmitter, harman/kardon Surround Sound System, harman/kardon? Speakers, Heated door mirrors, Heated Front Seats, Heated front seats, Icon Adaptive LED Headlights w/Laserlight, Illuminated entry, Knee airbag, Leather Shift Knob, Low tire pressure warning, Lumbar Support, M Shadowline Lights, M Sport Seats, Memory seat, Navigation System, Occupant sensing airbag, Outside temperature display, Overhead airbag, Panic alarm, Passenger door bin, Passenger vanity mirror, Power door mirrors, Power driver seat, Power Front Seats, Power passenger seat, Power steering, Power windows, Radio data system, Radio: AM/FM Audio System, Rain sensing wipers,



Ed Morse has been selling and leasing for less while providing excellent customer service for over 60 years. We presently have 15 dealerships, 16 franchises, and 10 brands from which to choose! Prices do not include tax, tag, title, registration, any dealer-installed accessories, or dealer- provided benefits. Additional fees include a pre-delivery service fee of $999 a Private Tag Agency Fee of $98, and an Electronic Registration Filing Fee of $199.75, which charges represent costs and profits to the dealer for items such as inspecting, cleaning, and adjusting vehicles, and preparing documents related to the sale. The price for new vehicles excludes the $3,995 Advantage package. The price for pre-owned vehicles excludes the $1,995 Advantage package. We strive to update our inventory regularly, but there may be a delay between the sale of a vehicle and inventory updates. Prices, specifications, and availability are subject to change without notice. Pricing includes all applicable manufacturer incentives and may not be combined with other exclusive offers. All advertised prices are for in-stock units only and include all applicable dealer, manufacturer discounts and incentives. Some offers and incentives require financing through the Manufacturer Captive Lender, subject to approved credit. Please contact the dealer for the most current information and details. While every reasonable effort has been made to ensure the accuracy of this information, the dealership is not responsible for errors or omissions on this site. To receive any special or advertised pricing, a copy of the advertisement must be presented at the time of purchase. Due to supply chain challenges and limited inventory, vehicles may be subject to an additional market adjustment depending on inventory production, availability, and market conditions. See dealer for complete details. Prior sales are excluded. By submitting my cell phone number to the Dealership, I agree to receive text messages, and phone calls, which may be recorded and/or sent using automated dialing equipment or software from Ed Morse Cadillac in Tampa, FL and its affiliates in the future, unless I opt-out from such communications. I understand that my consent to be contacted is not a requirement to purchase any product or service and that I can opt-out at any time. I agree to pay my mobile service providers text messaging rates, if applicable.

Carfax



  • Suspension, Active
  • Navigation System With Voice Recognition
  • Navigation System, Hard Drive
  • Navigation System, Touch Screen Display
  • Headlights, LED
  • Driver Attention Alert System
  • Driver Seat, Power Adjustments: 14
  • Pre-Collision Warning System, Audible Warning
  • Pre-collision Warning System, Vibrating Steering Wheel
  • Pre-Collision Warning System, Visual Warning
  • Blind Spot Sensor
  • Cross Traffic Alert, Rear
  • Air Conditioning - Rear - Automatic Climate Control
  • Airbags - Front - Knee
  • Lane Deviation Sensors
  • Air Conditioning - Front - Automatic Climate Control
  • Memorized Settings, Includes Driver Seat
  • Memorized Settings, Includes Exterior Mirrors
  • Traffic Sign Recognition
  • Air Conditioning - Front - Dual Zones
  • Steering Wheel Mounted Controls, Paddle Shifter
  • Interior, Leather Accents
  • Windows, Front Wipers: Rain Sensing
  • Windows, Front Wipers: Speed Sensitive
  • Air Conditioning - Rear - With Independent Controls
  • Engine, Push-Button Start
  • Engine, Auto Stop/Start
  • Driver Seat, Heated
  • Headlights, Automatic High Beam Dimmer
  • Passenger Seat, Heated
  • Passenger Seat, Power Adjustments: 14
  • Universal Garage Door Opener, Homelink
  • Daytime Running Lights, LED
  • Inside Rearview Mirror, Auto-Dimming
  • Exterior Mirrors, Power Folding
  • Seats, Front Seat Type: Sport Bucket
  • Tail And Brake Lights, LED
  • Airbags - Front - Side
  • Airbags - Front - Side Curtain
  • Airbags - Rear - Side Curtain
  • Driver Adjustable Suspension: Ride Control
  • Interior, Aluminum Accents
  • Parking Sensors, Front
  • Parking Sensors, Rear
  • Air Conditioning, Air Filtration: Active Charcoal
  • Drivetrain, Locking Differential: Rear
  • Memorized Settings, Includes Audio System
  • Memorized Settings, Includes Climate Control
  • Cruise Control
  • Electronic Messaging Assistance With Voice Recognition
  • Power Steering, Speed-Proportional
  • ABS Brakes (4-Wheel)
  • Exterior Mirrors, Driver Side Auto-Dimming
  • Power Windows: With Safety Reverse
  • Audio Auxiliary Input: IPod/IPhone Integration
  • Audio Auxiliary Input: USB
  • Sport Suspension
  • Ambient Lighting, Color-Adjustable
  • Auto-Lock
  • Cornering Brake Control
  • Emergency Braking Preparation
  • Exterior Mirrors, Power
  • Front Headrests, Power Adjustable
  • Exterior Mirrors, Heated
  • Drivetrain, 4WD Type: Full Time
  • Rear Seats, 40-20-40 Split Bench
  • Electronic Parking Brake, Auto Off
  • Exterior Entry Lights, Puddle Lamps
  • Exterior Entry Lights, Security Approach Lamps
  • Floor Mat Material, Carpet
  • Memorized Settings, Number Of Drivers: 2
  • Rear Spoiler, Lip
  • Security, Anti-Theft Alarm System
  • Taillights, Adaptive
  • Windows, Front Wipers: Variable Intermittent
  • Windows, Rear Defogger
  • Braking Assist
  • Drivetrain, Drive Mode Selector
  • Braking assist, hill start assist
  • Airbags - Front - Dual
  • Exterior Mirrors, Integrated Turn Signals
  • Power Brakes
  • Rear Seats, Split Folding
  • Security, Engine Immobilizer
  • Exterior Mirrors, Reverse Gear Tilt
  • Front 12V Power Outlet(s)
  • Steering Wheel, Tilt And Telescopic
  • Child Seat Anchors, LATCH System
  • Driver Seat, Adjustable Lumbar Support: 4-Way Power
  • Front Suspension Classification: Independent
  • Front Suspension Type: Strut
  • Headlights, Auto On/Off
  • Multi-Function Display
  • Seats - Passenger Seat Power Adjustments: 4-Way Power Lumbar
  • Center Console, Front Console With Armrest And Storage
  • Electronic Brakeforce Distribution
  • Compass
  • Headlights, Auto Delay Off
  • External Temperature Display
  • Fuel Economy Display, MPG
  • Fuel Economy Display, Range
  • One-Touch Windows: 4
  • Stability Control
  • Touch-Sensitive Controls
  • Traction Control
  • Airbags - Passenger - Occupant Sensing Deactivation
  • Door Courtesy Lights
  • Driver Seat, Power Adjustments: Recline
  • Passenger Seat, Power Adjustments: Recline
  • Power Windows: Remote Operation
  • Reading Lights, Front
  • Reading Lights, Rear
  • Seatbelts, Emergency Locking Retractors: Front
  • Seatbelts, Seatbelt Force Limiters: Front
  • Seatbelts, Seatbelt Pretensioners: Front
  • Seats - Driver Seat Power Adjustments: Height
  • Seats - Passenger Seat Power Adjustments: Height
  • Tachometer
  • Vanity Mirrors, Dual Illuminating
  • Warnings And Reminders, Maintenance Reminder
  • Cargo Area Light
  • Suspension, Stabilizer Bar(s): Front
  • Suspension, Stabilizer Bar(s): Rear
  • Rear Bumper Color, Body-Color
  • Steering Wheel Mounted Controls, Audio
  • Steering Wheel Mounted Controls, Cruise Controls
  • Steering Wheel Mounted Controls, Multi-Function Screen Controls
  • Steering Wheel Mounted Controls, Phone
  • Steering Wheel Mounted Controls, Voice Recognition Controls
  • Air Conditioning - Rear - Single Zone
  • Impact Sensor, Alert System
  • Impact Sensor, Battery Disconnect
  • Impact Sensor, Door Unlock
  • Impact Sensor, Fuel Cut-Off
  • Impact Sensor, Post-Collision Safety System
  • Mirror Color, Black
  • Seatbelts, Emergency Locking Retractors: Front And Rear
  • Seatbelts, Seatbelt Warning Sensor: Driver And Passenger
  • Adjustable Rear Headrests
  • Audio - Antenna: Diversity
  • Audio - Antenna: Mast
  • Automatic Hazard Warning Lights,
  • Child Safety Locks
  • Clock
  • Crumple Zones, Front
  • Digital Odometer
  • Emergency Interior Trunk Release
  • Front Seatbelts: 3-Point
  • Number Of Front Headrests, 2
  • Number Of Rear Headrests, 3
  • Seatbelts, Second Row 3-Point
  • Trip Odometer
  • Warnings And Reminders, Low Fuel Level
  • Warnings And Reminders, Low Oil Level
  • Windows, Lockout Button
*While every reasonable effort is made to ensure the accuracy of this data, we are not responsible for any errors or omissions contained on this page. Please verify all information with a dealership sales representative.

This vehicle is located at:
Ed Morse Cadillac Tampa
101 E. Fletcher Ave
Tampa, FL 33612
Phone: 888-297-8879

Open Google Directions
Pricing and Information Disclaimer: All vehicle prices are subject to change without notice. This may be due to, but not limited to, accessories or options added by our accessory specialists.