2024 BMW M3 Competition xDrive
2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive
« Previous      Next »






At Eckert Hyundai and Genesis of Denton we are guided by our credo. WE MAKE OUR GUEST FEEL SPECIAL. OUR PRODUCTS SEAMLESSLY COMBINE DESIGN, INNOVATION AND PERFORMANCE. OUR PROFESSIONALS ARE PASSIONATE, UNASSUMING AND EMPOWERED TO DELIGHT. OUR EXPERIENCES ARE RESPECTFUL AND INTENDED TO INSPIRE TRUST AND CONFIDENCE. WE ARE ON A JOURNEY TO CREATE DESIRE AND BUILD LONG TERM RELATIONSHIP.

Call 940-243-6200 to schedule a test drive today! Mention this ad to receive Eckert Hyundai's LOW NO HAGGLE price! The price you see is the price you pay.

Price: $89,980
 
  • Body style: Sedan AWD
  • Mileage: 17,248
  • Engine: 6 Cylinder 3L
  • Trans: 8-Speed Shiftable Automatic
  • Exterior Color: Black Sapphire Metallic
  • Interior Color: Fiona Red/Black
  • Stock: 39492A
  • VIN: WBS43AY09RFS40525


Click thumbnails below to view larger images
2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive 2024 BMW M3 Competition xDrive

Similar Vehicles
2020 Mercedes-Benz E-Class E 450 4MATIC 2020 Mercedes-Benz E-Class E 450 4MATIC
Price: Price: $23,381

Miles: 80,556
Exterior Color: BLACK
Stock Number: P5271G
Engine: 6 Cylinder
Transmission: 9-Speed Shiftable Automatic
2022 Nissan Altima 2.5 SV 2022 Nissan Altima 2.5 SV
Price: Price: $17,995

Miles: 42,619
Exterior Color: SILVER
Stock Number: 932667C
Engine: 4 Cylinder
Transmission: CVT
2023 Genesis G80 3.5T Sport 2023 Genesis G80 3.5T Sport
Price: Price: $43,995

Miles: 47,324
Exterior Color: SAVILE SILVER
Stock Number: 286873G
Engine: 6 Cylinder
Transmission: 8-Speed Shiftable Automatic
2025 Hyundai ELANTRA Limited 2025 Hyundai ELANTRA Limited
Price: Price: $28,605

Miles: 7
Exterior Color: FLUID METAL
Stock Number: N28476
Engine: 4 Cylinder
Transmission: CVT




  • Suspension, Active
  • Navigation System With Voice Recognition
  • Navigation System, Touch Screen Display
  • Headlights, LED
  • Driver Attention Alert System
  • Driver Seat, Power Adjustments: 14
  • Pre-Collision Warning System, Audible Warning
  • Pre-collision Warning System, Vibrating Steering Wheel
  • Pre-Collision Warning System, Visual Warning
  • Blind Spot Sensor
  • Cross Traffic Alert, Rear
  • Air Conditioning - Rear - Automatic Climate Control
  • Airbags - Front - Knee
  • Lane Deviation Sensors
  • Air Conditioning - Front - Automatic Climate Control
  • Memorized Settings, Includes Driver Seat
  • Memorized Settings, Includes Exterior Mirrors
  • Traffic Sign Recognition
  • Air Conditioning - Front - Dual Zones
  • Steering Wheel Mounted Controls, Paddle Shifter
  • Interior, Leather Accents
  • Windows, Front Wipers: Rain Sensing
  • Windows, Front Wipers: Speed Sensitive
  • Air Conditioning - Rear - With Independent Controls
  • Engine, Push-Button Start
  • Engine, Auto Stop/Start
  • Driver Seat, Heated
  • Headlights, Automatic High Beam Dimmer
  • Passenger Seat, Heated
  • Passenger Seat, Power Adjustments: 14
  • Universal Garage Door Opener, Homelink
  • Daytime Running Lights, LED
  • Inside Rearview Mirror, Auto-Dimming
  • Exterior Mirrors, Power Folding
  • Seats, Front Seat Type: Sport Bucket
  • Tail And Brake Lights, LED
  • Airbags - Front - Side
  • Airbags - Front - Side Curtain
  • Airbags - Rear - Side Curtain
  • Driver Adjustable Suspension: Ride Control
  • Interior, Aluminum Accents
  • Parking Sensors, Front
  • Parking Sensors, Rear
  • Air Conditioning, Air Filtration: Active Charcoal
  • Drivetrain, Locking Differential: Rear
  • Memorized Settings, Includes Audio System
  • Memorized Settings, Includes Climate Control
  • Cruise Control
  • Electronic Messaging Assistance With Voice Recognition
  • Power Steering, Speed-Proportional
  • ABS Brakes (4-Wheel)
  • Exterior Mirrors, Driver Side Auto-Dimming
  • Power Windows: With Safety Reverse
  • Audio Auxiliary Input: IPod/IPhone Integration
  • Audio Auxiliary Input: USB
  • Sport Suspension
  • Ambient Lighting, Color-Adjustable
  • Auto-Lock
  • Cornering Brake Control
  • Emergency Braking Preparation
  • Exterior Mirrors, Power
  • Front Headrests, Power Adjustable
  • Exterior Mirrors, Heated
  • Drivetrain, 4WD Type: Full Time
  • Rear Seats, 40-20-40 Split Bench
  • Electronic Parking Brake, Auto Off
  • Exterior Entry Lights, Puddle Lamps
  • Exterior Entry Lights, Security Approach Lamps
  • Floor Mat Material, Carpet
  • Memorized Settings, Number Of Drivers: 2
  • Rear Spoiler, Lip
  • Security, Anti-Theft Alarm System
  • Taillights, Adaptive
  • Windows, Front Wipers: Variable Intermittent
  • Windows, Rear Defogger
  • Braking Assist
  • Drivetrain, Drive Mode Selector
  • Braking assist, hill start assist
  • Airbags - Front - Dual
  • Exterior Mirrors, Integrated Turn Signals
  • Power Brakes
  • Rear Seats, Split Folding
  • Security, Engine Immobilizer
  • Exterior Mirrors, Reverse Gear Tilt
  • Front 12V Power Outlet(s)
  • Steering Wheel, Tilt And Telescopic
  • Child Seat Anchors, LATCH System
  • Driver Seat, Adjustable Lumbar Support: 4-Way Power
  • Front Suspension Classification: Independent
  • Front Suspension Type: Strut
  • Headlights, Auto On/Off
  • Multi-Function Display
  • Seats - Passenger Seat Power Adjustments: 4-Way Power Lumbar
  • Center Console, Front Console With Armrest And Storage
  • Electronic Brakeforce Distribution
  • Compass
  • Headlights, Auto Delay Off
  • External Temperature Display
  • Fuel Economy Display, MPG
  • Fuel Economy Display, Range
  • One-Touch Windows: 4
  • Stability Control
  • Touch-Sensitive Controls
  • Traction Control
  • Airbags - Passenger - Occupant Sensing Deactivation
  • Door Courtesy Lights
  • Driver Seat, Power Adjustments: Recline
  • Passenger Seat, Power Adjustments: Recline
  • Power Windows: Remote Operation
  • Reading Lights, Front
  • Reading Lights, Rear
  • Seatbelts, Emergency Locking Retractors: Front
  • Seatbelts, Seatbelt Force Limiters: Front
  • Seatbelts, Seatbelt Pretensioners: Front
  • Seats - Driver Seat Power Adjustments: Height
  • Seats - Passenger Seat Power Adjustments: Height
  • Tachometer
  • Vanity Mirrors, Dual Illuminating
  • Warnings And Reminders, Maintenance Reminder
  • Cargo Area Light
  • Suspension, Stabilizer Bar(s): Front
  • Suspension, Stabilizer Bar(s): Rear
  • Rear Bumper Color, Body-Color
  • Steering Wheel Mounted Controls, Audio
  • Steering Wheel Mounted Controls, Cruise Controls
  • Steering Wheel Mounted Controls, Multi-Function Screen Controls
  • Steering Wheel Mounted Controls, Phone
  • Steering Wheel Mounted Controls, Voice Recognition Controls
  • Air Conditioning - Rear - Single Zone
  • Impact Sensor, Alert System
  • Impact Sensor, Battery Disconnect
  • Impact Sensor, Door Unlock
  • Impact Sensor, Fuel Cut-Off
  • Impact Sensor, Post-Collision Safety System
  • Mirror Color, Black
  • Seatbelts, Emergency Locking Retractors: Front And Rear
  • Seatbelts, Seatbelt Warning Sensor: Driver And Passenger
  • Adjustable Rear Headrests
  • Audio - Antenna: Diversity
  • Audio - Antenna: Mast
  • Automatic Hazard Warning Lights,
  • Child Safety Locks
  • Clock
  • Crumple Zones, Front
  • Digital Odometer
  • Emergency Interior Trunk Release
  • Front Seatbelts: 3-Point
  • Number Of Front Headrests, 2
  • Number Of Rear Headrests, 3
  • Seatbelts, Second Row 3-Point
  • Trip Odometer
  • Warnings And Reminders, Low Fuel Level
  • Warnings And Reminders, Low Oil Level
  • Windows, Lockout Button
  • Audible Warning Pre-Collision Warning System
  • 3-Point Front Seatbelts
  • Front Seatbelt Pretensioners
  • Visual Warning Pre-Collision Warning System
  • Emergency Interior Trunk Release
  • Traffic Sign Recognition
  • Traction Control
  • Fuel Cut-Off Impact Sensor
  • Front Parking Sensors
  • Post-Collision Safety System Impact Sensor
  • Battery Disconnect Impact Sensor
  • Latch System Child Seat Anchors
  • Check Rear Seat Reminder
  • Alarm Anti-Theft System
  • Auto-Locking Power Door Locks
  • 3-Point Rear Seatbelts
  • Anti-Tow Sensor Anti-Theft System
  • Door Unlock Impact Sensor
  • Vibrating Steering Wheel Pre-Collision Warning System
  • Vehicle Immobilizer Anti-Theft System
  • Rear Emergency Locking Retractors
  • Alert System Impact Sensor
  • Sensor/Alert Blind Spot Safety
  • Front Automatic Emergency Braking
  • Anti-Lockout Power Door Locks
  • Rear Cross Traffic Alert
  • Pedestrian Detection Pre-Collision Warning System
  • Front Emergency Locking Retractors
  • Automatic Hazard Warning Lights
  • Rear Parking Sensors
  • Stability Control
  • Front Crumple Zones
  • Rearview Camera System
  • Front Seatbelt Force Limiters
  • Hill Holder Control
  • Front Seatbelt Warning Sensor
  • Interior Motion Sensor Anti-Theft System
  • In Dash Rearview Monitor
  • Driver Attention Alert System
  • Front Pedestrian Automatic Emergency Braking
  • Child Safety Door Locks
  • Lane Deviation Sensors
  • Seating Rows: 2
  • Leg Room 1St Row: 41.6
  • Wheelbase: 112.5
  • Standard Seating: 5
  • Head Room 1St Row: 40.6
  • Passenger Volume: 95.0
  • Rear Track Width: 63.2
  • Rear Brake Diameter: 14.6
  • Max Payload: 860
  • Fuel Tank Capacity: 15.6
  • Front Wheel Size: 19.0 X 9.5
  • Acceleration (0-60Mph): 3.40
  • Rear Wheel Width: 10.5
  • Steering Ratio: 14.6
  • Aerodynamic Drag: 0.33
  • Max Seating: 5
  • Shoulder Room 2Nd Row/Rear: 54.6
  • Cargo Volume: 16.9
  • Height: 56.5
  • Length: 189.1
  • Front Track Width: 63.7
  • Curb Weight: 3990
  • Rear Wheel Size: 20.0 X 10.5
  • Gross Vehicle Weight Range: 4001-5000
  • Shoulder Room 1St Row: 56.0
  • Head Room 2Nd Row/Rear: 37.8
  • Front Tire Description: 275/35R19
  • Rear Wheel Diameter: 20.0
  • Width Without Mirrors: 74.3
  • Gross Vehicle Weight Rating: 4982
  • Front Wheel Diameter: 19.0
  • Turning Circle: 41.3
  • Leg Room 2Nd Row/Rear: 35.6
  • Width: 81.4
  • Axle Ratio: 3.15
  • Tire Type: Performance
  • Ground Clearance: 4.8
  • Front Brake Diameter: 15.0
  • Front Wheel Width: 9.5
  • Rear Tire Description: 285/30R20
  • Phone Steering Wheel Mounted Controls
  • Paddle Shifter Steering Wheel Mounted Controls
  • Usb-C Front Power Outlet(S)
  • Vehicle And Key Memory Multi-Function Remote
  • Voice Control Steering Wheel Mounted Controls
  • Audio Steering Wheel Mounted Controls
  • Touch-Sensitive Controls
  • Rear Reading Lights
  • Aluminum Dash Trim
  • Aluminum Foot Pedal Trim
  • Alloy Shift Knob Trim
  • Side Mirrors Memorized Settings
  • Cruise Control Steering Wheel Mounted Controls
  • Tilt And Telescopic Steering Wheel
  • Cargo Net Storage
  • Auto-Dimming Rearview Mirror
  • Trunk Release Multi-Function Remote
  • Rear Assist Handle
  • Carpet Floor Mat Material
  • Climate Control Memorized Settings
  • Variable/Speed-Proportional Power Steering
  • Scuff Plate Door Sill Trim
  • Door Courtesy Lights
  • Door Pockets Storage
  • Leather Steering Wheel Trim
  • Front Assist Handle
  • Aluminum Door Trim
  • Panic Alarm Multi-Function Remote
  • Carpet Floor Material
  • Leather Door Trim
  • Homelink - Garage Door Opener Universal Remote Transmitter
  • Push-Button Start
  • Lockout Button Power Windows
  • Front Reading Lights
  • Aluminum Interior Accents
  • Dual Illuminating Vanity Mirrors
  • Audio System Memorized Settings
  • Leather Interior Accents
  • Cruise Control
  • Color-Adjustable Ambient Lighting
  • One-Touch Windows: 4
  • Front Wireless Charging Station
  • Armrests Rear Center Folding With Pass-Thru
  • Color-Adjustable Footwell Lights
  • Cargo Area Carpet Floor Material
  • Rear Floor Mats
  • Leather Center Console Trim
  • Cargo Area Light
  • Driver Seat Memorized Settings
  • Aluminum Door Sill Trim
  • Proximity Entry System Multi-Function Remote
  • Aluminum Center Console Trim
  • Usb Front Power Outlet(S)
  • Front Floor Mats
  • Usb-C Rear Power Outlet(S)
  • 12V Front Power Outlet(S)
  • Multi-Function Steering Wheel Mounted Controls
  • Center Console Front Console With Armrest And Storage
  • Accessory Hook Storage
  • Front Cupholders
  • Cargo Tie-Down Anchors And Hooks Storage
  • 2 Driver Memorized Settings
*While every reasonable effort is made to ensure the accuracy of this data, we are not responsible for any errors or omissions contained on this page. Please verify all information with a dealership sales representative.

This vehicle is located at:
Eckert Hyundai
3811 S-I-35 East
Denton, TX 76210
Phone: 940-243-6200
Pricing and Information Disclaimer: All vehicle prices are subject to change without notice. This may be due to, but not limited to, accessories or options added by our accessory specialists.